Completed Projects
Summers Athletic Complex - click for photos
The four-phase construction has been completed on the Athletic Complex:
- Much work has been done to the existing Summers Gymnasium complex: converted the office area into a fitness area; built a new facade giving it an appearance compatible with other campus buildings; installed air conditioning; renovated existing locker rooms, public restrooms, and laundry and uniform storage areas; and built a concession stand on the mezzanine level.
- Added a one-story facility on the west side of the Summers Gymnasium complex that houses the athletic training area.
- Added a two-story complex to the east side of the Summers Gymnasium complex that includes ten offices for the director of athletics, coaches, and sports information director; conference room; and new locker rooms for Bryan's teams.
- The practice gym, which is housed in a separate building from the Summers Gymnasium, includes two floors and provides much-needed space for the five intercollegiate teams that use the gym in the fall.
Bryan Health PolyClinic - click for photos
Housed on the lower south end of the Rankin Communication Arts Center, the Bryan Health PolyClinic occupies some 1,500 square feet and is staffed by medical personnel from Sports Care Chattanooga under the supervision of Dr. David Jenkinson.
Robinson Hall - click for more media
Robinson Hall is home to 120 female students and features two wings on each of four floors, with 12-20 students per wing.